• This Sunday 4/23 the BC will be traveling to Floris UMC in Herndon, VA for worship at two services and to observe the transition of their worship center from contemporary to traditional style between services.  Lunch with Floris staff will follow as an opportunity for Q&A and to hear their lessons learned.
  • Work on a traffic impact study required by PADOT has begun.  A joint meeting will be held tomorrow with South Middleton and Carlisle Borough staffs to discuss the necessary scope of the study as both municipalities must ultimately approve the results.  At this time the study will be focused upon our East Baltimore Street access to the site, and the distribution of the majority of traffic coming from or exiting towards the Borough on South Spring Garden Street.
  • For a first look at our preliminary floor plan and budget including the results of Capital Campaign #1, plan to attend the upcoming April 30 Congregation Information Sessions at 945AM in the Sanctuary or 1100AM in the MPR.
  • The congregational vote to approve our preliminary design and budget will be held on September 24.  Leading up to that vote, the following additional Congregational Information Sessions have been scheduled:

       April 30 – Design update – preliminary floor plan & budget w/ cap campaign   results      

       June 11 – Master Plan presentation & design update

       July 16 – Design update

      Aug 20 – Design update

      Sept 17 – Combined service followed by BC presentation of preliminary design and preliminary budget to be voted upon

      Sept 24 – Vote to approve Preliminary Design and Preliminary Budget